Mold Remediation
Identify and correct the moisture source. Establish containment and negative air. Remove contaminated materials under Industrial Hygienist protocols. Verify clearance with post-remediation testing. Restore to pre-loss condition. That is the correct sequence, and every step must be documented.
Mold remediation performed without moisture source correction will fail. Remediation performed without containment spreads spores. JH Construction manages the full sequence: moisture source correction, HEPA containment, negative air pressure, abatement, and third-party clearance testing.
- IICRC S520
- Cal/OSHA
- IH Protocols
- Clearance Testing
- Xactimate Documentation
